Home / Projects / Oil, Gas & Chemical / 18,000-Ton On-Land Modular Skids in Nigeria: Pre-Fabricated Integration and Field Efficiency
18,000-Ton On-Land Modular Skids in Nigeria: Pre-Fabricated Integration and Field Efficiency
Heavy steel skids are engineered to support complex networks of industrial pipelines and pressure vessels efficiently.







Project Overview
Located in Nigeria, this on-land modular skid facility provides processing infrastructure for local oil and gas extraction. Operating in remote areas presents logistical challenges. Managers must navigate unpaved terrain and a shortage of specialized on-site welding labor, which delays construction. Shijie addressed these hurdles with an integrated modular skid solution. Our engineers designed heavy-duty steel frameworks supporting dense configurations of industrial pipelines, vessels, and grating walkways. By maximizing factory pre-fabrication, we minimized complex field assembly. The skids were transported and installed using straightforward bolted connections. A heavy-duty anti-corrosion coating protects structures from the humid environment. Completing the installation 40 days early allowed operators to commence processing reliably.
| Location | Niger Delta Region, Nigeria |
| Application | Oil & Gas Processing Skids |
| Scale | 18,000 Tons of Steel Structures |
| Structure | Heavy-Duty Modular Skid Frames |
| Integration | Pre-Installed Piping & Walkways |
| Assembly | 100% Bolted Field Connections |
| Corrosion | Tropical High-Humidity Epoxy |
| Logistics | Containerized Modular Transport |
| Safety | Integrated Metal Grating Platforms |
| Delivery | Handover 40 Days Ahead of Schedule |
High-Density Integration
Heavy steel skids are engineered to support complex networks of industrial pipelines and pressure vessels efficiently.
Factory Pre-Fabrication
Maximizing off-site manufacturing ensures quality control and reduces the dependency on skilled field welders.
Tropical Durability
An industrial-grade anti-corrosion coating system protects the framework from the high humidity typical of the region.
Streamlined Erection
Precision-engineered bolted connections enabled construction crews to assemble the modules steadily on prepared terrain.
Turning Site Challenges into Engineered Certainty
Proven technical interventions to keep your project on spec, on budget, and on schedule
Remote sites with unpaved roads complicate the transportation of large conventional building materials.
Designed modular skids that fit within standard transport dimensions, optimizing logistics across rugged terrain.
A lack of specialized on-site labor can compromise the quality of complex structural welding.
Shifted fabrication to the factory, allowing local teams to perform straightforward bolted assembly on-site.
Developing processing infrastructure in Nigeria requires practical engineering. Transporting materials over red dirt roads is difficult, and finding certified welders for field fabrication always delays our schedule. Shijie provided a modular skid solution that fit our site conditions. Walking across the grating walkways, you can see how efficiently pipelines and vessels are integrated into the steel frames. By completing the complex fabrication in their factory, they delivered modules our crews could simply bolt together. The anti-corrosion coating handles high humidity effectively. Finishing the installation 40 days early allowed our mechanical teams to integrate the systems steadily. They are a dependable industrial partner.
Products Used in Project
Similar Projects
To be confirmed
Why Global Contractors Choose SynJect
Predictable delivery, certified compliance, and direct engineering support for zero-risk execution
Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays
Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability
Work directly with senior structural engineers from Tekla 3D modeling to on-site erection
Frequently Asked Questions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam