Home / Projects / Logistics & Warehousing / 60,000 sqm Automated Storage and Retrieval System (ASRS) Hub in Vietnam: Millimeter Precision and Typhoon Resilience

60,000 sqm Automated Storage and Retrieval System (ASRS) Hub in Vietnam: Millimeter Precision and Typhoon Resilience

The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.

PROJECT OVERVIEW

Project Overview

Located in Vietnam's industrial corridor, this 60,000 sqm Automated Storage and Retrieval System (ASRS) hub is the beating heart of local e-commerce logistics. In automated warehousing, investors suffer from paralyzing anxiety over structural deflection. Even a millimeter of steel deformation can jam high-speed robotic stacker cranes, crippling the supply chain. Furthermore, Vietnam's aggressive monsoons threaten catastrophic water damage and rapid steel corrosion. Shijie Heavy Industry eradicated these nightmares by delivering a rack-clad steel structure with absolute precision. Utilizing LOD 500 BIM and robotic CNC fabrication, we guaranteed flawless alignment for the automated tracks. We engineered the heavy portal frame to possess extreme rigidity, neutralizing wind shear from typhoons. Coated with a tropical-grade polyurethane anti-corrosion system, the facility repels relentless moisture. By employing a rapid bolted assembly, we delivered this mega-hub 45 days ahead of schedule, securing the client's ROI.

PROJECT DATA
CountryVietnam Industrial Zone
ApplicationASRS Logistics Warehouse
Scale60,000 sqm Floor Area
StructureRack-Clad Building System
PrecisionMillimeter-Level Tolerance
Wind LoadTyphoon Resistant Design
CorrosionTropical Polyurethane Coating
Assembly100% Bolted Pre-Fabrication
WaterproofingSeamless Roof Drainage
DeliveryFinished 45 Days Early
01

Absolute Robotic Precision

The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.

02

Typhoon-Proof Rigidity

The steel skeleton is strictly engineered to withstand Southeast Asian monsoons, preventing structural sway that derails systems.

03

Tropical Moisture Shield

A premium polyurethane coating provides an impenetrable barrier against Vietnam's humidity, securing a rust-free lifespan.

04

Ultra-Fast ROI Generation

Avoiding slow concrete curing, the bolted dry assembly accelerated the schedule, handing over the facility 45 days early.

Turning Site Challenges into Engineered Certainty

Proven technical interventions to keep your project on spec, on budget, and on schedule

THE CHALLENGE

ASRS robots demand zero deflection; any misalignment during erection causes catastrophic supply chain failure.

SJ ENGINEERED SOLUTION

Implemented 3D BIM and CNC laser cutting to guarantee millimeter-level node precision during field bolting.

THE CHALLENGE

Vietnam's violent monsoons threaten severe roof leakage and swaying, endangering highly sensitive electronics.

SJ ENGINEERED SOLUTION

Deployed heavy braced frames for extreme rigidity and a seamless metal roof to ensure 100% waterproof operations.

THE CHALLENGE
SJ ENGINEERED SOLUTION
Nguyen H.
CLIENT VOICE

Deploying an automated warehouse in Vietnam is extremely risky. If the steel frame shifts slightly under wind load, our robotic cranes will crash, costing millions. Shijie Heavy Industry delivered absolute perfection. Their CNC manufacturing provided the exact millimeter precision our ASRS vendor demanded. The structural rigidity is phenomenal; during the last typhoon, the building didn't sway a fraction, and our robots picked orders flawlessly. Their tropical coating system easily handles the humidity. Handing over the keys 45 days early allowed us to capture massive market share during the holiday surge. They are true masters of precision engineering!

Nguyen H.
Supply Chain Director, SE Asia

Products Used in Project

Similar Projects

To be confirmed

Why Global Contractors Choose SynJect

Predictable delivery, certified compliance, and direct engineering support for zero-risk execution

Delivery

Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays

Compliance

Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability

Team

Work directly with senior structural engineers from Tekla 3D modeling to on-site erection

Frequently Asked Questions

To be confirmed

To be confirmed

To be confirmed

To be confirmed

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam