Home / Projects / Logistics & Warehousing / 60,000 sqm Automated Storage and Retrieval System (ASRS) Hub in Vietnam: Millimeter Precision and Typhoon Resilience
60,000 sqm Automated Storage and Retrieval System (ASRS) Hub in Vietnam: Millimeter Precision and Typhoon Resilience
The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.







Project Overview
Located in Vietnam's industrial corridor, this 60,000 sqm Automated Storage and Retrieval System (ASRS) hub is the beating heart of local e-commerce logistics. In automated warehousing, investors suffer from paralyzing anxiety over structural deflection. Even a millimeter of steel deformation can jam high-speed robotic stacker cranes, crippling the supply chain. Furthermore, Vietnam's aggressive monsoons threaten catastrophic water damage and rapid steel corrosion. Shijie Heavy Industry eradicated these nightmares by delivering a rack-clad steel structure with absolute precision. Utilizing LOD 500 BIM and robotic CNC fabrication, we guaranteed flawless alignment for the automated tracks. We engineered the heavy portal frame to possess extreme rigidity, neutralizing wind shear from typhoons. Coated with a tropical-grade polyurethane anti-corrosion system, the facility repels relentless moisture. By employing a rapid bolted assembly, we delivered this mega-hub 45 days ahead of schedule, securing the client's ROI.
| Country | Vietnam Industrial Zone |
| Application | ASRS Logistics Warehouse |
| Scale | 60,000 sqm Floor Area |
| Structure | Rack-Clad Building System |
| Precision | Millimeter-Level Tolerance |
| Wind Load | Typhoon Resistant Design |
| Corrosion | Tropical Polyurethane Coating |
| Assembly | 100% Bolted Pre-Fabrication |
| Waterproofing | Seamless Roof Drainage |
| Delivery | Finished 45 Days Early |
Absolute Robotic Precision
The rack-clad framework was fabricated with CNC accuracy, ensuring high-speed robotic stackers operate without jamming risks.
Typhoon-Proof Rigidity
The steel skeleton is strictly engineered to withstand Southeast Asian monsoons, preventing structural sway that derails systems.
Tropical Moisture Shield
A premium polyurethane coating provides an impenetrable barrier against Vietnam's humidity, securing a rust-free lifespan.
Ultra-Fast ROI Generation
Avoiding slow concrete curing, the bolted dry assembly accelerated the schedule, handing over the facility 45 days early.
Turning Site Challenges into Engineered Certainty
Proven technical interventions to keep your project on spec, on budget, and on schedule
ASRS robots demand zero deflection; any misalignment during erection causes catastrophic supply chain failure.
Implemented 3D BIM and CNC laser cutting to guarantee millimeter-level node precision during field bolting.
Vietnam's violent monsoons threaten severe roof leakage and swaying, endangering highly sensitive electronics.
Deployed heavy braced frames for extreme rigidity and a seamless metal roof to ensure 100% waterproof operations.
Deploying an automated warehouse in Vietnam is extremely risky. If the steel frame shifts slightly under wind load, our robotic cranes will crash, costing millions. Shijie Heavy Industry delivered absolute perfection. Their CNC manufacturing provided the exact millimeter precision our ASRS vendor demanded. The structural rigidity is phenomenal; during the last typhoon, the building didn't sway a fraction, and our robots picked orders flawlessly. Their tropical coating system easily handles the humidity. Handing over the keys 45 days early allowed us to capture massive market share during the holiday surge. They are true masters of precision engineering!
Products Used in Project
Similar Projects
To be confirmed
Why Global Contractors Choose SynJect
Predictable delivery, certified compliance, and direct engineering support for zero-risk execution
Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays
Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability
Work directly with senior structural engineers from Tekla 3D modeling to on-site erection
Frequently Asked Questions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam