48,000 sqm Hyperscale Supercomputing Data Center in Singapore: Heavy-Duty Rigidity, Vibration Control, and Accelerated Delivery
The robust steel skeleton is engineered to bear the extreme loads of massive rooftop cooling towers essential for AI.







Project Overview
Located in the tech hub of Singapore, this 48,000 sqm hyperscale supercomputing data center is the backbone of the region's AI infrastructure. Speed to market is paramount; any delay costs millions in lost cloud revenue. Developers harbor intense anxieties regarding structural integrity under the colossal weight of rooftop cooling systems, vibration transmission to sensitive servers, and concrete dust. Shijie Heavy Industry eradicated these operational fears by delivering a high-precision structural steel framework. Utilizing advanced 3D BIM clash detection and off-site prefabrication, we eliminated hazardous welding and wet concrete. Our engineered steel frame safely supports extreme floor loads and massive chiller arrays, employing integrated dampeners to neutralize vibrations. Coated to resist relentless tropical humidity, the framework was erected entirely through high-strength bolted connections. This ultra-fast assembly allowed structural handover 30 days ahead of schedule.
| Location | Singapore |
| Application | Hyperscale Data Center |
| Scale | 48,000 sqm Floor Area |
| Structure | Heavy Steel Frame |
| Load | High Capacity (>= 15 kN/sqm) |
| Vibration | Engineered Dampers |
| Corrosion | ISO C4 Epoxy |
| Assembly | 100% Bolted Dry Erection |
| Compliance | BCA Green Mark |
| Delivery | Completed 30 Days Early |
Heavy Mechanical Support
The robust steel skeleton is engineered to bear the extreme loads of massive rooftop cooling towers essential for AI.
Vibration Isolation
Strategic dampening systems prevent intense mechanical vibrations from transferring into sensitive server rack environments.
Ultra-Clean Erection
Fully prefabricated bolted connections eliminated hazardous welding sparks and concrete dust, ensuring a pristine site for parallel server deployment.
Tropical Durability
Advanced multi-layer industrial epoxy coatings relentlessly resist Singapore's year-round equatorial humidity, guaranteeing structural lifespan.
Turning Site Challenges into Engineered Certainty
Proven technical interventions to keep your project on spec, on budget, and on schedule
AI computers require colossal rooftop cooling, creating severe vibrations and massive point loads.
Implemented heavy wide-flange beams with tuned elastomeric dampening nodes to safely absorb stress.
Singapore's exorbitant manual labor costs and strict regulations regarding construction dust.
Deployed an off-site fabricated system, enabling rapid, dust-free bolting to drastically reduce labor.
Deploying an AI-ready hyperscale data center in Singapore requires absolute precision and speed. Concrete construction generates too much dust and takes too long to cure. Shijie Heavy Industry transformed our strategy. Their steel framework arrived engineered to perfection, slotting together without field modifications. The rigidity is phenomenal; we have massive chiller arrays running at maximum capacity on the roof, yet zero vibration transfers to the servers. Their clean assembly method allowed our teams to begin fit-outs weeks earlier. By topping out 30 days early, Shijie saved us a fortune in labor and let us bring cloud services online a month early. A truly world-class structural engineering partner.
Products Used in Project
Similar Projects
To be confirmed
Why Global Contractors Choose SynJect
Predictable delivery, certified compliance, and direct engineering support for zero-risk execution
Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays
Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability
Work directly with senior structural engineers from Tekla 3D modeling to on-site erection
Frequently Asked Questions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam