Home / Projects / Oil, Gas & Chemical / 65,000-Ton Oil Refinery and Processing Structures in Algeria: Heavy Load Support and Fire-Resistant Design

65,000-Ton Oil Refinery and Processing Structures in Algeria: Heavy Load Support and Fire-Resistant Design

Engineered with thick-walled steel columns and heavy cross-bracing to securely support the substantial weight of multi-level distillation units.

PROJECT OVERVIEW

Project Overview

Located in the arid zones of Algeria, this refinery expansion provides the necessary framework for heavy hydrocarbon processing. Operators manage complex schedules and strict safety regulations. They face specific challenges: ensuring structures support the immense weight of distillation columns, applying reliable fireproofing to mitigate hydrocarbon fire risks, and protecting steel from abrasive Saharan sand. Shijie supplied a robust steel framing system to meet these requirements. We engineered heavy-duty rigid steel frames to carry multi-tiered processing units. Critical columns were treated with intumescent fire-resistant coatings to comply with petrochemical safety codes. Utilizing a modular, pre-bolted fabrication strategy, our teams erected the facilities efficiently, reducing on-site welding in the desert heat. Completing the framework 35 days early provided a reliable base for subsequent equipment installation and piping integration.

PROJECT DATA
LocationAlgerian Industrial Zone
ApplicationOil Refinery & Processing Plant
Scale65,000 Tons of Steel
StructureHeavy-Duty Rigid Frames
Load CapacityHigh-Tonnage Equipment Support
Fire SafetyIntumescent Fire Coating
CorrosionAbrasion Resistant Epoxy
AssemblyPre-Drilled Bolted Joints
IntegrationMulti-Tiered Process Layout
DeliveryHandover 35 Days Early
01

Robust Load Integrity

Engineered with thick-walled steel columns and heavy cross-bracing to securely support the substantial weight of multi-level distillation units.

02

Advanced Fire Protection

Critical load-bearing structures are coated with an industrial-grade intumescent fireproofing system, ensuring stability during thermal events.

03

Desert Weather Shielding

A durable epoxy topcoat protects the steel framework from the abrasive effects of windblown Saharan sand, maintaining long-term integrity.

04

Controlled Site Assembly

A modular construction approach utilizing pre-drilled bolted connections reduced reliance on field welding, facilitating safer erection.

Turning Site Challenges into Engineered Certainty

Proven technical interventions to keep your project on spec, on budget, and on schedule

THE CHALLENGE

Heavy refining equipment places immense stress on the supporting structural infrastructure.

SJ ENGINEERED SOLUTION

Deployed multi-tiered heavy moment frames to safely distribute high-tonnage loads to the foundations.

THE CHALLENGE

Petrochemical processing requires strict fire safety measures to prevent structural collapse.

SJ ENGINEERED SOLUTION

Applied specialized fire-resistant coatings to critical steel members, increasing the fire endurance rating.

THE CHALLENGE
SJ ENGINEERED SOLUTION
Youssef B.
CLIENT VOICE

Expanding a refining facility in the Algerian desert requires practical infrastructure. Operating here means we must carefully manage structural durability and stringent petrochemical safety codes. Our priority is ensuring processing units are supported securely without operational delays. Shijie delivered a capable steel framework that met our specifications. Looking across the processing zones, the heavy steel structures handle the multi-tiered equipment loads with clear stability. Their design addressed our fire safety requirements by integrating fire-resistant coatings directly onto the members. The epoxy finish has held up well against the abrasive sandstorms. By manufacturing components accurately and using a bolted assembly method, they allowed our contractors to build safely without excessive welding in the heat. Finishing 35 days early gave our mechanical teams the time needed for piping integration. They are a dependable partner.

Youssef B.
Operations Director, Algerian Petroleum Corp

Products Used in Project

Similar Projects

To be confirmed

Why Global Contractors Choose SynJect

Predictable delivery, certified compliance, and direct engineering support for zero-risk execution

Delivery

Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays

Compliance

Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability

Team

Work directly with senior structural engineers from Tekla 3D modeling to on-site erection

Frequently Asked Questions

To be confirmed

To be confirmed

To be confirmed

To be confirmed

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam