Project Overview
Located in Perak, Malaysia, this 30MW biomass plant converts palm residues into electricity. Handling empty fruit bunches creates demanding operating conditions. Managers must ensure steady fuel delivery amidst monsoon rain and heat. Practical concerns include conveyor vibration from continuous transport, corrosion from organic acids released by damp biomass, and tight erection windows between storms. Shijie engineered a reliable structural system for the facility. We fabricated heavy boiler frames and enclosed conveyor galleries with stiffeners to dampen vibration. Columns near storage received acid-resistant epoxy coatings to counter corrosive leachate. Using pre-drilled bolted joints, crews erected the structures 35 days early, enabling testing before the monsoon.
| Location | Perak Plantation Belt, Malaysia |
| Application | Palm Waste-to-Energy Power Plant |
| Steel Scale | 26,000 Tons Structural Steel |
| Structure | Rigid Boiler Frame & Conveyor Trusses |
| Gallery Span | 48m Clear Span Enclosed Trusses |
| Corrosion | Acid-Resistant Epoxy Phenolic |
| Vibration | Dynamic Stiffened Frame System |
| Assembly | 100% Pre-Drilled Bolted Joints |
| Weathering | Heavy Rain Runoff Roof Design |
| Schedule | Handover 35 Days Ahead of Time |
Dynamic Stiffening
Enclosed galleries feature reinforced bracing to suppress operational vibration during fuel transport.
Acid Protection
Steel members near biomass storage are coated with epoxy phenolic to resist corrosive organic acids.
Enclosed Corridors
Clad elevated galleries prevent wet fuel clumping during sudden rainstorms, stabilizing boiler feed.
Pre-Drilled Erection
Precision shop bolting enabled crews to assemble boiler frames quickly between rainfall breaks.
Turning Site Challenges into Engineered Certainty
Proven technical interventions to keep your project on spec, on budget, and on schedule
Damp palm biomass emits organic acids in storage that corrode standard steel coatings over time.
Applied an industrial-grade epoxy phenolic coating system to columns and baseplates near storage bays.
Long-span elevated conveyors suffer continuous vibration that can cause fatigue in connection nodes.
Designed box-section trusses with high-strength friction bolted joints to maintain joint rigidity.
Operating a biomass plant near Malaysian palm estates presents tough conditions. Decomposing palm residues produce acidic runoff, and equatorial rain is relentless. Our priority was verifying conveyor stability and anti-corrosion performance near bunkers. Shijie met our expectations. The conveyor galleries operate with minimal vibration under full load. The coating on columns near storage shows no bubbling despite acid exposure. Pre-drilled bolt holes allowed crews to assemble boiler tiers during dry breaks without re-drilling. Finishing 35 days early gave us time for testing before the monsoon.
Products Used in Project
Similar Projects
To be confirmed
Why Global Contractors Choose SynJect
Predictable delivery, certified compliance, and direct engineering support for zero-risk execution
Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays
Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability
Work directly with senior structural engineers from Tekla 3D modeling to on-site erection
Frequently Asked Questions
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Get Your 24-Hour BOQ and Cost Plan
See how much steel tonnage and ocean freight you can save before fabrication begins
Steel Weight Savings
1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.
Zero-Clash Code Verification
Checked against EN 1090 and local wind/seismic loads.
Engineer-to-Engineer Review
Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.
CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001
Lead Engineers Online
🔒 100% Private and Secure, No Spam