PROJECT OVERVIEW

Project Overview

Located in South Africa, this 120,000 sqm complex supports the regional transition to EV manufacturing. Automakers operate on strict schedules, and facility delays impact production targets. Managers face specific engineering challenges: ensuring roofs bear the dynamic loads of overhead conveyors, integrating loading docks for battery logistics, and preventing dust from contaminating active paint shops. Shijie Heavy Industry addressed these requirements with a high-capacity steel truss system. We integrated a high-density bay of loading docks to streamline inbound logistics for heavy battery packs. Deep-web trusses were deployed to support suspended loads. The battery zone features specialized fire-resistant coatings to meet safety codes. Inside, a wide column-free grid provides flexibility for automated guided vehicle routing. Utilizing a pre-engineered bolted assembly method, teams avoided on-site welding and minimized dust. Completing the structure 45 days early provided a reliable foundation for setting up production.

PROJECT DATA
LocationIndustrial Zone, South Africa
ApplicationEV Assembly & Logistics Plant
Scale120,000 sqm Manufacturing Facility
StructureHeavy Steel Truss Framework
Roof LoadReinforced for Overhead Conveyors
LogisticsHigh-Density Truck Loading Bays
Clear SpanWide Grid for AGV Routing
Fire SafetyFire-Resistant Coating Applied
Assembly100% Bolted Dry Erection
DeliveryHandover 45 Days Early
01

Load Capacity

Engineered with roof trusses to safely bear the dynamic weight of continuous overhead car conveyors and equipment.

02

Inbound Logistics

The exterior layout features an array of loading docks, streamlining the intake of heavy EV battery packs.

03

Agile Span

A wide structural grid provides unobstructed space, facilitating the efficient layout of automated guided vehicles.

04

Controlled Erection

The bolted approach minimized field welding and dust, keeping adjacent production environments clean.

Turning Site Challenges into Engineered Certainty

Proven technical interventions to keep your project on spec, on budget, and on schedule

THE CHALLENGE

Dynamic loads from overhead conveyors cause fatigue, and inbound supply chains require high-throughput docking capacities.

SJ ENGINEERED SOLUTION

Deployed deep-web roof trusses for load capacity and integrated continuous docking bays for seamless component delivery.

THE CHALLENGE

Constructing a facility near operational zones requires strict dust management to protect sensitive automotive paint.

SJ ENGINEERED SOLUTION

Executed a bolted assembly strategy, enabling a clean erection process that bypassed concrete curing and minimized dust.

THE CHALLENGE
SJ ENGINEERED SOLUTION
Hendrick M.
CLIENT VOICE

Establishing an EV line in South Africa requires dependable infrastructure. Deflecting conveyors can stall welding lines. Handling batteries also demands efficient logistics. Shijie provided a solid solution. The layout is optimized for operational efficiency. Their trusses carry suspended car bodies steadily, showing excellent structural integrity. The loading docks have smoothed our supply chain intake. By utilizing a bolted assembly, they erected this structure without generating dust that could compromise our nearby paint shop. Receiving the facility 45 days early gave us the buffer to set up equipment on time. They are a dependable partner.

Hendrick M.
Plant Operations Manager, South African Auto Group

Products Used in Project

Similar Projects

To be confirmed

Why Global Contractors Choose SynJect

Predictable delivery, certified compliance, and direct engineering support for zero-risk execution

Delivery

Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays

Compliance

Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability

Team

Work directly with senior structural engineers from Tekla 3D modeling to on-site erection

Frequently Asked Questions

To be confirmed

To be confirmed

To be confirmed

To be confirmed

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.

CE EN 1090-1•ISO 9001•ISO 14001•ISO 45001

Engineering & Inquiry Desk

Lead Engineers Online

Drawings
Drawings

🔒 100% Private and Secure, No Spam