Home / Projects / Modular & Camp Solutions / 1,450 sqm Bespoke Coastal Prefab Light Steel Villa in Jeddah: Marine C5 Anti-Corrosion, Zero-Thermal-Bridge Comfort, and 60-Day Turnkey Delivery

1,450 sqm Bespoke Coastal Prefab Light Steel Villa in Jeddah: Marine C5 Anti-Corrosion, Zero-Thermal-Bridge Comfort, and 60-Day Turnkey Delivery

Wide-flange steel columns support 12-meter open cantilevers and floor-to-ceiling glass without vibration.

PROJECT OVERVIEW

Project Overview

Perched on Jeddah’s Red Sea coastline, this 1,450 sqm bespoke villa redefines luxury residential engineering in Saudi Arabia. In coastal regions, homeowners face traditional concrete hurdles: slow 18-month wet-work timelines, dust, salt-spalling, and thermal bridging that breeds mold. Clients also fear prefab steel feels lightweight, vibrates underfoot, or sounds hollow. Shijie Heavy Industry eliminated these psychological and technical barriers by combining a heavy structural steel skeleton with cold-formed light gauge steel framing. Outfitted with marine-grade coatings, triple thermal breaks, and decoupled acoustic subfloors, the villa was manufactured off-site and erected cleanly in 45 days. This rapid delivery gave the client complete privacy, thermal comfort, and solid architectural permanence.

PROJECT DATA
LocationCoastal Corniche, Jeddah, Saudi Arabia
ApplicationUltra-Luxury Private Coastal Villa Estate
Floor Area1,450 sqm Total Area across 2 Stories
Frame SystemHybrid Heavy Steel Skeleton + Cold-Formed LGS
Corrosion ClassISO 12944 C5-M Marine Heavy Epoxy Barrier
Thermal BarrierMulti-Layer Wall Assembly with U-Value <= 0.18
Acoustic RatingSTC >= 62 dB for Floor and Interior Partitions
Glass FacadeDouble-Glazed Argon Low-E Toughened Safety Glass
Assembly Window45-Day Frame Erection with 100% Dry Fastening
Handover TimelineCompleted 35 Days Ahead of Client's Baseline
01

Hybrid Structural Rigidity

Wide-flange steel columns support 12-meter open cantilevers and floor-to-ceiling glass without vibration.

02

Marine C5-M Corrosion Defense

G275 galvanized framing coated with marine epoxy withstands coastal humidity and salt spray for 50 years.

03

Zero-Condensation Envelope

Multi-layer insulation and thermal-break connectors eliminate cold bridges and cut cooling costs by 45%.

04

Decoupled Acoustic Subfloors

Engineered elastomeric floor damping achieves STC 62 dB, matching cast-in-place concrete solid feel.

Turning Site Challenges into Engineered Certainty

Proven technical interventions to keep your project on spec, on budget, and on schedule

THE CHALLENGE

Red Sea salt fog corrodes steel framing and breeds toxic mold within interior wall cavities.

SJ ENGINEERED SOLUTION

Deployed ISO C5-M marine epoxy coatings and ventilated vapor-permeable thermal-break wall assemblies.

THE CHALLENGE

Luxury homeowners reject prefab light steel due to hollow acoustic feel and footfall vibration.

SJ ENGINEERED SOLUTION

Engineered decoupled composite acoustic floor slabs with elastomeric damping, delivering solid acoustic privacy.

THE CHALLENGE
SJ ENGINEERED SOLUTION
Tariq Al-H.
CLIENT VOICE

Building a luxury villa in Jeddah usually means enduring two years of concrete dust and delays. Shijie proved that prefab steel delivers true ultra-luxury. The acoustic privacy is astonishing—no hollow sounds or echoes. The villa feels as solid as masonry, stays wonderfully cool, and was erected cleanly in weeks. Pure peace of mind.

Tariq Al-H.
Private Villa Owner & Investor (Jeddah)

Products Used in Project

Similar Projects

To be confirmed

Why Global Contractors Choose SynJect

Predictable delivery, certified compliance, and direct engineering support for zero-risk execution

Delivery

Pre-assembled in our factory and 3D-nested for containers to cut ocean freight and site delays

Compliance

Fabricated strictly to CE EN 1090-1, AISC, and ISO 9001 / 14001 / 45001 with full NDT traceability

Team

Work directly with senior structural engineers from Tekla 3D modeling to on-site erection

Frequently Asked Questions

To be confirmed

To be confirmed

To be confirmed

To be confirmed

Get Your 24-Hour BOQ and Cost Plan

See how much steel tonnage and ocean freight you can save before fabrication begins

8–15%

Steel Weight Savings

1:1 Tekla 3D modeling optimizes beam-column ratios to eliminate redundant material costs.

0.0mm

Zero-Clash Code Verification

Checked against EN 1090 and local wind/seismic loads.

100%

Engineer-to-Engineer Review

Verified by our lead engineers—Zero pushy sales calls, Just actionable data and factory price.