Garment Workshop Steel Structures

Steel structures for garment and textile workshops: wide single-storey portal frames or multi-storey frames with daylight, ventilation and open production floors, fabricated under EN 1090-2 EXC2 with the envelope and openings quoted together.

What Garment Manufacturers Ask Us to Solve

Production floors live or die by light, air and open space — the frame has to deliver all three.

THE CHALLENGE

Sewing floors need daylight without glare

SJ ENGINEERED SOLUTION

FRP or polycarbonate skylight panels are set in the roof at the spacing the lighting design needs, with the roof panels around them, so daylight arrives with the cladding rather than as an afterthought.

THE CHALLENGE

Hot, still air over the machines

SJ ENGINEERED SOLUTION

Gravity ventilators are sized to the heat load and roof geometry and supplied with the roof; louvre windows and wall openings are located at design so cross-ventilation works with the line layout.

THE CHALLENGE

Columns that break the production line

SJ ENGINEERED SOLUTION

Clear-span portal frames for single-storey workshops, or multi-storey frames with composite floors where cutting, sewing and storage stack vertically; column positions follow the line layout drawn by your production planner.

THE CHALLENGE

Storage and offices on upper floors

SJ ENGINEERED SOLUTION

Composite floors with profiled decking and welded steel stairs carry storage and office loads; floor beams are detailed with the decking so the storey arrives as one package.

How Your Project Is Built

Three phases from the first drawing to handover. Move over a phase to see what happens in it and what you receive at the end of it.

PHASE 01 / PRE-CONSTRUCTION

Engineering & Foundation

The structure is sized in a 3D BIM model before any steel is cut. While members are fabricated in the factory, earthworks and independent foundations are poured on site in parallel from the anchor bolt templates we ship first.

PHASE 02 / CONSTRUCTION

Fabrication & Erection

Columns, beams and trusses are CNC-cut, welded, tested and trial-assembled in the yard, then shipped in erection sequence. On site the frame is bolted from marked members with the erection drawings and our remote or on-site guidance.

PHASE 03 / COMPLETION

Envelope & Handover

Cladding, insulation, openings and rainwater goods close the building; dimensional and coating records are handed over with the as-built drawings and the certificate package.

CERTIFICATIONS & COMPLIANCE

Certifications & Compliance

Every shipment leaves with the documents an auditor asks for. Scroll the row and open any certificate at full size.

China Steel Structure Manufacturing Grade I

AISC Certification

CE Marking – EN 1090-2 (CPR 01627)

OTC Document of Validity

International Welder Certification

Enterprise Qualifications Portfolio

DG Packaging Certificate

Labor & Scaffolding Contracting

Explosion-Proof Certificate

Industrial Pipeline Installation GC1

Power Facility License

Technical Parameters

What the frame is sized from, and what is fixed before fabrication.

ParameterWhat it is set from
Building formatSingle-storey clear-span portal frame, or multi-storey frame with composite floors, following the line layout
Daylight and ventilationFRP/PC skylight panels, louvre windows and gravity ventilators located and sized at design
Floor loadsLive loads for machinery, storage and offices per the production layout and the local code
EnvelopeRoof and wall panels with supplier-declared U-value and fire class; doors and windows with the maker’s declared performance classes
Site loadsWind, snow and seismic loads calculated for the site location to the design code your project specifies
Execution classEN 1090-2 EXC2 (certificate 2787-CPR-01627)
Lead time40 to 50 days for a typical single-building portal frame scope: 1–2 weeks to shop drawings for your approval, then 4–5 weeks for fabrication, coating and loading; larger or multi-building projects are phased by building
DocumentationMTRs, WPS/PQR, welder certificates, NDT and DFT reports, erection drawings and the certificate package with every shipment

Recommended Product Systems

The structural systems we fabricate most often for this kind of project. Each opens the product page with sub-systems, parameters and FAQ.

Multi-storey steel buildings from one fabricator: thick-web H and box columns, cruciform columns, steel floor beams, composite decking and stairs for commercial and industrial frames, with embedded parts and anchor bolts shipped ahead of the steel.

Pre-engineered buildings on a steel portal frame, the rigid frame building type of every PEB catalogue: tapered H-section primary frames, cold-formed purlins, bracing and anchor bolts detailed as one system for workshops, warehouses and agricultural halls.

Steel truss structures for long-span roofs: circular pipe trusses, square tube trusses, angle steel trusses and H- or I-beam trusses fabricated as roof truss systems for terminals, stations, industrial halls and exhibition centres.

Building envelope systems quoted with the steel frame: roof and wall cladding, insulation and waterproofing, industrial doors, windows, louvers and ventilators, gutters and downspouts.

Frequently Asked Questions

Single-storey or multi-storey for a garment workshop?

It follows the plot and the process. A wide clear-span portal frame keeps every line on one level; a multi-storey frame stacks cutting, sewing and storage where land is limited. Send the plot size and headcount and we propose both with a BOQ.

Yes. FRP or polycarbonate skylight panels are supplied with the roof cladding at the spacing the lighting design needs.

Gravity ventilators sized to the heat load and roof geometry, plus louvre windows and wall openings located at design; mechanical systems stay with your MEP consultant.

Yes — profiled decking, floor beams, gratings and welded stairs are quoted with the frame as one package.

For a single-building portal frame scope the standard cycle is 40 to 50 days: 1–2 weeks to shop drawings for your approval, then 4–5 weeks for fabrication, coating and loading; larger projects are phased by building.

Mill certificates per heat, welding procedure and welder records, NDT and coating reports, erection drawings and the CE and AISC certificate package.