Space Frame Structures

Solid Bolt Spheres

Solid bolt spheres for bolted-ball space frames: forged spherical nodes drilled and tapped to the strut angles on your node schedule, marked with their grid reference and supplied with sleeves, cones, sealing plates and set screws. The node of most bolted space frame roofs, made in-house to the node standard your design specifies.

A bolted-ball space frame is erected without site welding, which is why the sphere carries the whole geometry: every hole is drilled at the angle of the strut it receives and tapped for that bolt size. We machine the spheres from the node schedule in the 3D model, not from a generic pattern.

Spheres ship marked with their grid reference, together with the high-strength sleeves, cones, sealing plates and set screws for the struts that meet at each node. Forging and steel certificates are tied to heat numbers and issued with the kit.

Part of Space Frame Nodes in Space Frame Structures . Other components in this sub-system: Hollow Welded Spheres · Sealing Plates (48-89mm) · Cones (76-325mm) · High-Strength Sleeves (17-86mm) · Set Screws (6/8/10mm)

Technical Specifications

ItemSpecification
StandardBolted spherical nodes machined to the node schedule of your design; execution under EN 1090-2 EXC2 (certificate 2787-CPR-01627)
MachiningHoles drilled and tapped to the strut angles and bolt sizes of the node schedule
FittingsHigh-strength sleeves 17–86 mm, cones 76–325 mm, sealing plates 48–89 mm, set screws 6/8/10 mm
MarkingGrid reference stamped on every sphere, matching the erection drawings
CoatingBlasted and coated to the ISO 12944 system of the roof
DocumentationForging and steel certificates, node schedule and marking plan with the kit

Section sizes, grades and quantities for this product are issued with the quotation once your design basis and loads are received.

Advantages vs Engineering Considerations

AdvantagesEngineering Considerations
Drilled to the scheduleHole angles and thread sizes follow your node schedule; each sphere is marked with its grid reference.Node geometry must be frozen early; late changes ripple through every member length and bolt.
No site weldingBolted-ball nodes let the roof be erected by bolting alone, which suits regular grids and fast programmes.Erection needs a level, accurately set support system or temporary staging for the assembled grid.
Kit or componentsSupplied as a complete node kit with the struts, or as components for contractors who weld pipe struts locally.Roof drainage and cladding fixing need a secondary system detailed together with the space frame.
Traceable forgingsForging and steel certificates are tied to heat numbers and issued with the consignment.Large numbers of members and bolts require disciplined marking and packing to avoid site sorting.
CERTIFICATIONS & COMPLIANCE

Certifications & Compliance

Every shipment leaves with the documents an auditor asks for. Scroll the row and open any certificate at full size.

China Steel Structure Manufacturing Grade I

AISC Certification

CE Marking – EN 1090-2 (CPR 01627)

OTC Document of Validity

International Welder Certification

Enterprise Qualifications Portfolio

DG Packaging Certificate

Labor & Scaffolding Contracting

Explosion-Proof Certificate

Industrial Pipeline Installation GC1

Power Facility License

Have drawings or a BOQ ready? Send them through the form and our engineers reply with a preliminary assessment.

SynJect

SynJect. Scale. Precision. Certainty.

SYNJECT delivers comprehensive steel structure solutions engineered for the global value chain. From investors seeking ROI to engineers demanding exact compliance, we transform complex blueprints into robust realities—on time and without friction.

SynJect ENGINEERING

From Microns to Megastructures — 12 Rigorous Stages Certified to AISC & EN 1090

Detailed Engineering & Shop Drawing DevelopmentNesting & Material OptimizationRaw Material Incoming InspectionCNC Cutting & Edge PreparationPrimary Structural WeldingWeld Distortion StraighteningNon-Destructive Testing (NDT)Trial Assembly & Shop AlignmentSurface Preparation & Protective CoatingFinal Quality Inspection & CertificationExport Packaging & Logistics ProtectionGlobal Field Erection & Site Management
Stage.01

Detailed Engineering & Shop Drawing Development

Utilizing advanced BIM platforms such as Tekla Structures, detailed 3D modeling and shop drawings are executed strictly in compliance with AISC 360 or Eurocode 3 (EN 1993). Connection designs are rigorously verified, with manufacturing drawings generated to ISO 2768-m tolerance standards. 100% clash detection with primary architectural and MEP systems is performed to ensure zero structural conflicts during field erection.

STANDARDAISC 360 / EN 1993
METRIC VALUETolerance ISO 2768-m
Stage.02

Nesting & Material Optimization

Intelligent nesting layouts are performed using advanced software like FastCAM/SigmaNEST in accordance with EN 10029 / ASTM A6 dimensional standards. Accounting for cutting kerf (2mm-5mm depending on plate thickness) and thermal contraction allowances, raw material utilization exceeds 92%. Offcuts are digitally barcode-tracked to ensure 100% mill test report (MTR) traceability.

STANDARDEN 10029 / ASTM A6
METRIC VALUEUtilization ≥92%
Stage.03

Raw Material Incoming Inspection

All structural steel (Q355B/C/D, ASTM A572 Gr.50, S355JR/J2) must be accompanied by EN 10204 3.1 Mill Test Reports (MTR). Incoming quality control conducts 100% dimensional and visual inspections under ASTM A6 / EN 10029, verifying thickness tolerances (Class A/B) and internal lamination integrity via Ultrasonic Testing (UT) to ASTM A435. Chemical composition and mechanical properties are spot-verified by accredited 3rd-party labs.

STANDARDEN 10204 3.1 / ASTM A435
METRIC VALUE100% MTR + UT
Stage.04

CNC Cutting & Edge Preparation

Plate profiling and component cutting are executed via CNC oxy-fuel, high-definition plasma, and multi-kW fiber laser equipment. Cut surface quality strictly complies with EN ISO 9013 for perpendicularity and surface roughness (Range 3/4 tolerance). Multi-axis CNC beveling machines execute weld prep bevel angles within ±2.5° and root face dimensions within ±1.0 mm.

STANDARDEN ISO 9013
METRIC VALUERa ≤12.5μm / ±2.5°
Stage.05

Primary Structural Welding

Welding is performed exclusively by AWS D1.1 or EN ISO 9606 certified welders using qualified Welding Procedure Specifications (WPS) supported by Procedure Qualification Records (PQR) per AWS D1.1 / ISO 15614. Submerged Arc Welding (SAW) and Flux-Cored Arc Welding (FCAW) dominate Complete Joint Penetration (CJP) and fillet welds. Heat input is strictly controlled, achieving weld quality levels conforming to ISO 5817 Quality Level B or AWS D1.1 standards.

STANDARDAWS D1.1 / EN ISO 9606
METRIC VALUEISO 5817 Level B
Stage.06

Weld Distortion Straightening

Post-weld angular distortion, camber, and sweep are rectified using automated hydraulic flange straighteners and controlled thermal flame straightening. Heating temperatures for High-Strength Low-Alloy (HSLA) steels are strictly maintained between 600-650 Celsius (air-cooled, zero water quenching) to prevent microstructural degradation. Post-straightening straightness tolerances meet ±3 mm, conforming to EN 1090-2 Execution Class 2 (EXC2) and AISC COSP standards.

STANDARDEN 1090-2 EXC2 / AISC COSP
METRIC VALUE≤ ±3 mm
Stage.07

Non-Destructive Testing (NDT)

NDT protocols are operated by ISO 9712 / ASNT Level II certified NDT personnel. 100% of critical Complete Joint Penetration (CJP) welds undergo Ultrasonic Testing (UT per ISO 17640 / ASTM E164) or Magnetic Particle Testing (MT per ISO 17638 / ASTM E709). Radiographic Testing (RT) is applied as requested for heavy sections. Weld acceptance conforms strictly to ISO 11666 Acceptance Level 1 or AWS D1.1 criteria.

STANDARDISO 11666 Level 1 / AWS D1.1
METRIC VALUE100% UT on CJP
Stage.08

Trial Assembly & Shop Alignment

Complex geometries, long-span trusses, and heavy framing undergo 1:1 physical trial assembly or high-precision 3D laser scanning virtual assembly per EN 1090-2 / AISC requirements. Bolt hole alignment is verified (≥95% free-pass rate for high-strength bolts), and critical dimensions (span, camber, 3D spatial alignment) are verified within tight tolerance limits (±2.0 mm) to eliminate site fitting risks.

STANDARDAISC / EN 1090-2
METRIC VALUE±2.0 mm / ≥95% pass
Stage.09

Surface Preparation & Protective Coating

Structural members undergo automated shot blasting to achieve SSPC-SP10 / NACE No. 2 / ISO 8501-1 Sa 2.5 cleanliness, with a surface profile (anchor depth) of 45-75 microns. High-performance protective coatings are applied using airless spray technology in compliance with ISO 12944 (C3 to CX corrosive environments), featuring Zinc-Rich Epoxy Primers, Epoxy Micaceous Iron Oxide Intermediate coats, and Polyurethane/Fluorocarbon Topcoats. Dry Film Thickness (DFT) is verified adhering strictly to the 90/10 rule.

STANDARDISO 8501-1 Sa 2.5 / ISO 12944
METRIC VALUE45-75 μm profile
Stage.10

Final Quality Inspection & Certification

Final Quality Control (FQC) performs a comprehensive audit, inspecting paint aesthetics (zero runs, pinholes, sagging), critical geometry, bolt hole pitches, and component mark traceability. A complete Manufacturing Data Report (MDR) comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance.

STANDARDEN 1090 / AISC
METRIC VALUEFull MDR Package
Stage.11

Export Packaging & Logistics Protection

Protective packaging is engineered for containerized (40HQ/OT/FR) and breakbulk ocean freight under heavy maritime transit conditions. Structural members are bundled on heavy-duty steel skids with high-tensile steel strapping. Machined connections are wrapped with VCI anti-corrosion film, EPE foam padding, and heavy rubber cushions. All timber packing complies fully with ISPM 15 phytosanitary standards and IMO Cargo Stowage and Securing (CSS) rules.

STANDARDISPM 15 / IMO CSS
METRIC VALUE40HQ / OT / FR
Stage.12

Global Field Erection & Site Management

We deliver international site erection supervision and turnkey EPCM construction services adhering to OSHA 1926 safety protocols, AISC COSP, and EN 1090-2 erection standards. Field teams, led by multilingual HSE and QA/QC engineers, utilize high-precision total stations to maintain structural plumbness within H/1000 (25mm max). High-Strength Structural Bolting is executed via calibrated Wrench or Turn-of-Nut methods with 100% torque audit documentation.

STANDARDOSHA 1926 / EN 1090-2
METRIC VALUE≤ H/1000

Frequently Asked Questions

Bolt spheres or welded hollow spheres — which suits our project?

Bolt spheres suit regular grids and fast bolted erection with no site welding. Welded hollow spheres suit irregular geometry and higher member forces. The decision affects the whole erection method, so it belongs in the design stage.

Yes. Every node carries a unique mark tied to the erection drawing, because a space frame with unmarked nodes is effectively unbuildable on site.

Yes. Bolt spheres, sleeves, cones, sealing plates and set screws are quoted against the node schedule; struts can be added or sourced locally.

The space frame drawings or 3D model with the node schedule: strut angles, bolt sizes and sphere diameters per node. From that we machine, mark and kit the spheres.

By grid zone in labelled crates with the matching sleeves, cones and set screws, so each crate opens to one area of the roof.

Yes. We quote sub-systems separately where the scope makes sense — for example secondary framing or bracing against an existing structure. Send the BOQ and connection details of the receiving structure so the interfaces are engineered rather than assumed.

Whichever your design specifies. Design intent to AISC 360 or Eurocode 3 (EN 1993), execution to EN 1090-2 EXC2 under certificate 2787-CPR-01627.

Never without written approval. If a specified section has a long lead time we propose the alternative with the calculation showing equivalence, and you decide.

Mill test certificates per heat, WPS/PQR, welder qualification certificates, NDT reports with technician level, and coating thickness records against the specified ISO 12944 system.

The standard cycle for a single-building scope is 40 to 50 days: 1–2 weeks to shop drawings for your approval, then 4–5 weeks for procurement, fabrication, coating and loading.