Steel Truss Systems

Home / Products / Steel Truss Systems / Truss Frameworks

Truss Frameworks

Truss frameworks fabricated as complete units: circular pipe trusses, square tube trusses, angle steel trusses and H- or I-beam trusses, CNC-profiled at the joints, shop-welded in transport lengths and trial-assembled so each truss arrives ready for bolting. This page details the truss units themselves; the Steel Truss Systems line page covers the full package with web members, bracing and high-strength bolts.

What we fabricate in this sub-system

  • Circular Pipe Trusses (EN 1993-1-1 / AISC 360)
  • Angle Steel Trusses (EN 1993-1-1 / AISC 360)
  • Square Tube Trusses (EN 1993-1-1 / AISC 360)
  • H/I-Beam Trusses (EN 1993-1-1 / AISC 360)

Technical Specifications

ItemSpecification
Design basisAISC 360 / EN 1993-1-1
Execution classEN 1090-2 EXC2 (certificate 2787-CPR-01627)
WeldingAWS D1.1 / EN ISO 9606 qualified procedures and welders
NDTISO 11666 / AWS D1.1, technicians to ISO 9712 or ASNT Level II
Corrosion protectionISO 12944, system selected per site environment (C3–CX)
DocumentationMTRs, WPS/PQR, welder certificates, NDT and DFT reports with every shipment

Section sizes, grades and tolerances for these components are issued with the quotation once your design basis and loads are received.

Advantages vs Engineering Considerations

AdvantagesEngineering Considerations
Pipe truss for terminals and stationsCircular tubular trusses are the format specified for airport terminals, railway stations and large canopies; members are CNC profiled and fit-up is checked in the shop before shipping.Depth-to-span ratio drives stiffness; shallow trusses deflect more and may need camber.
Long-span roofs without internal columnsTruss depth and chord sections are set from your span and roof loads, giving clear halls for logistics, exhibition and sport.Truss chords are transported in segments and spliced on site; splice positions follow transport limits.
Trial assembly of complex nodesTrusses with three-dimensional nodes are trial-assembled in the yard with dimensional reports before shipping.Tubular joints depend on weld quality and inspection; closed sections are harder to repair after coating.
Dual certificationAISC certified and CE marked to EN 1090-2 EXC2 under certificate 2787-CPR-01627.Lateral bracing and purlin restraint are part of the truss design, not an afterthought.
CERTIFICATIONS & COMPLIANCE

Certifications & Compliance

Every shipment leaves with the documents an auditor asks for. Scroll the row and open any certificate at full size.

China Steel Structure Manufacturing Grade I

AISC Certification

CE Marking – EN 1090-2 (CPR 01627)

OTC Document of Validity

International Welder Certification

Enterprise Qualifications Portfolio

DG Packaging Certificate

Labor & Scaffolding Contracting

Explosion-Proof Certificate

Industrial Pipeline Installation GC1

Power Facility License

Have drawings or a BOQ ready? Send them through the form and our engineers reply with a preliminary assessment.

SynJect

SynJect. Scale. Precision. Certainty.

SYNJECT delivers comprehensive steel structure solutions engineered for the global value chain. From investors seeking ROI to engineers demanding exact compliance, we transform complex blueprints into robust realities—on time and without friction.

SynJect ENGINEERING

From Microns to Megastructures — 12 Rigorous Stages Certified to AISC & EN 1090

Detailed Engineering & Shop Drawing DevelopmentNesting & Material OptimizationRaw Material Incoming InspectionCNC Cutting & Edge PreparationPrimary Structural WeldingWeld Distortion StraighteningNon-Destructive Testing (NDT)Trial Assembly & Shop AlignmentSurface Preparation & Protective CoatingFinal Quality Inspection & CertificationExport Packaging & Logistics ProtectionGlobal Field Erection & Site Management
Stage.01

Detailed Engineering & Shop Drawing Development

Utilizing advanced BIM platforms such as Tekla Structures, detailed 3D modeling and shop drawings are executed strictly in compliance with AISC 360 or Eurocode 3 (EN 1993). Connection designs are rigorously verified, with manufacturing drawings generated to ISO 2768-m tolerance standards. 100% clash detection with primary architectural and MEP systems is performed to ensure zero structural conflicts during field erection.

STANDARDAISC 360 / EN 1993
METRIC VALUETolerance ISO 2768-m
Stage.02

Nesting & Material Optimization

Intelligent nesting layouts are performed using advanced software like FastCAM/SigmaNEST in accordance with EN 10029 / ASTM A6 dimensional standards. Accounting for cutting kerf (2mm-5mm depending on plate thickness) and thermal contraction allowances, raw material utilization exceeds 92%. Offcuts are digitally barcode-tracked to ensure 100% mill test report (MTR) traceability.

STANDARDEN 10029 / ASTM A6
METRIC VALUEUtilization ≥92%
Stage.03

Raw Material Incoming Inspection

All structural steel (Q355B/C/D, ASTM A572 Gr.50, S355JR/J2) must be accompanied by EN 10204 3.1 Mill Test Reports (MTR). Incoming quality control conducts 100% dimensional and visual inspections under ASTM A6 / EN 10029, verifying thickness tolerances (Class A/B) and internal lamination integrity via Ultrasonic Testing (UT) to ASTM A435. Chemical composition and mechanical properties are spot-verified by accredited 3rd-party labs.

STANDARDEN 10204 3.1 / ASTM A435
METRIC VALUE100% MTR + UT
Stage.04

CNC Cutting & Edge Preparation

Plate profiling and component cutting are executed via CNC oxy-fuel, high-definition plasma, and multi-kW fiber laser equipment. Cut surface quality strictly complies with EN ISO 9013 for perpendicularity and surface roughness (Range 3/4 tolerance). Multi-axis CNC beveling machines execute weld prep bevel angles within ±2.5° and root face dimensions within ±1.0 mm.

STANDARDEN ISO 9013
METRIC VALUERa ≤12.5μm / ±2.5°
Stage.05

Primary Structural Welding

Welding is performed exclusively by AWS D1.1 or EN ISO 9606 certified welders using qualified Welding Procedure Specifications (WPS) supported by Procedure Qualification Records (PQR) per AWS D1.1 / ISO 15614. Submerged Arc Welding (SAW) and Flux-Cored Arc Welding (FCAW) dominate Complete Joint Penetration (CJP) and fillet welds. Heat input is strictly controlled, achieving weld quality levels conforming to ISO 5817 Quality Level B or AWS D1.1 standards.

STANDARDAWS D1.1 / EN ISO 9606
METRIC VALUEISO 5817 Level B
Stage.06

Weld Distortion Straightening

Post-weld angular distortion, camber, and sweep are rectified using automated hydraulic flange straighteners and controlled thermal flame straightening. Heating temperatures for High-Strength Low-Alloy (HSLA) steels are strictly maintained between 600-650 Celsius (air-cooled, zero water quenching) to prevent microstructural degradation. Post-straightening straightness tolerances meet ±3 mm, conforming to EN 1090-2 Execution Class 2 (EXC2) and AISC COSP standards.

STANDARDEN 1090-2 EXC2 / AISC COSP
METRIC VALUE≤ ±3 mm
Stage.07

Non-Destructive Testing (NDT)

NDT protocols are operated by ISO 9712 / ASNT Level II certified NDT personnel. 100% of critical Complete Joint Penetration (CJP) welds undergo Ultrasonic Testing (UT per ISO 17640 / ASTM E164) or Magnetic Particle Testing (MT per ISO 17638 / ASTM E709). Radiographic Testing (RT) is applied as requested for heavy sections. Weld acceptance conforms strictly to ISO 11666 Acceptance Level 1 or AWS D1.1 criteria.

STANDARDISO 11666 Level 1 / AWS D1.1
METRIC VALUE100% UT on CJP
Stage.08

Trial Assembly & Shop Alignment

Complex geometries, long-span trusses, and heavy framing undergo 1:1 physical trial assembly or high-precision 3D laser scanning virtual assembly per EN 1090-2 / AISC requirements. Bolt hole alignment is verified (≥95% free-pass rate for high-strength bolts), and critical dimensions (span, camber, 3D spatial alignment) are verified within tight tolerance limits (±2.0 mm) to eliminate site fitting risks.

STANDARDAISC / EN 1090-2
METRIC VALUE±2.0 mm / ≥95% pass
Stage.09

Surface Preparation & Protective Coating

Structural members undergo automated shot blasting to achieve SSPC-SP10 / NACE No. 2 / ISO 8501-1 Sa 2.5 cleanliness, with a surface profile (anchor depth) of 45-75 microns. High-performance protective coatings are applied using airless spray technology in compliance with ISO 12944 (C3 to CX corrosive environments), featuring Zinc-Rich Epoxy Primers, Epoxy Micaceous Iron Oxide Intermediate coats, and Polyurethane/Fluorocarbon Topcoats. Dry Film Thickness (DFT) is verified adhering strictly to the 90/10 rule.

STANDARDISO 8501-1 Sa 2.5 / ISO 12944
METRIC VALUE45-75 μm profile
Stage.10

Final Quality Inspection & Certification

Final Quality Control (FQC) performs a comprehensive audit, inspecting paint aesthetics (zero runs, pinholes, sagging), critical geometry, bolt hole pitches, and component mark traceability. A complete Manufacturing Data Report (MDR) comprising MTRs, NDT records, coating inspection logs, and Certificates of Conformance is compiled to support CE Marking (DoP under EN 1090) and AISC final acceptance.

STANDARDEN 1090 / AISC
METRIC VALUEFull MDR Package
Stage.11

Export Packaging & Logistics Protection

Protective packaging is engineered for containerized (40HQ/OT/FR) and breakbulk ocean freight under heavy maritime transit conditions. Structural members are bundled on heavy-duty steel skids with high-tensile steel strapping. Machined connections are wrapped with VCI anti-corrosion film, EPE foam padding, and heavy rubber cushions. All timber packing complies fully with ISPM 15 phytosanitary standards and IMO Cargo Stowage and Securing (CSS) rules.

STANDARDISPM 15 / IMO CSS
METRIC VALUE40HQ / OT / FR
Stage.12

Global Field Erection & Site Management

We deliver international site erection supervision and turnkey EPCM construction services adhering to OSHA 1926 safety protocols, AISC COSP, and EN 1090-2 erection standards. Field teams, led by multilingual HSE and QA/QC engineers, utilize high-precision total stations to maintain structural plumbness within H/1000 (25mm max). High-Strength Structural Bolting is executed via calibrated Wrench or Turn-of-Nut methods with 100% torque audit documentation.

STANDARDOSHA 1926 / EN 1090-2
METRIC VALUE≤ H/1000

Frequently Asked Questions

Do you fabricate tubular trusses for an airport terminal or railway station roof?

Yes. Send the roof plan, truss profiles and loads; circular pipe trusses are CNC-profiled, shop-welded in transport lengths and trial-assembled before shipping.

It depends on truss depth, chord sections and roof loads; the hangar and stadium scenes on this site show the range. Send the span and loads and we propose the truss type.

For geometrically complex trusses, yes — 1:1 physical trial assembly in our yard with dimensional reports and photographs before the members are coated and packed. It is the cheapest insurance against site rework on long-span work.

It follows the span, the exposure and whether the truss is visible. Circular pipe trusses look cleanest and shed water; angle trusses are the most economical for concealed spans; box sections carry the highest loads. Send the span and whether the structure is architecturally exposed.

Yes. We quote sub-systems separately where the scope makes sense — for example secondary framing or bracing against an existing structure. Send the BOQ and connection details of the receiving structure so the interfaces are engineered rather than assumed.

Whichever your design specifies. Design intent to AISC 360 or Eurocode 3 (EN 1993), execution to EN 1090-2 EXC2 under certificate 2787-CPR-01627.

Never without written approval. If a specified section has a long lead time we propose the alternative with the calculation showing equivalence, and you decide.

Mill test certificates per heat, WPS/PQR, welder qualification certificates, NDT reports with technician level, and coating thickness records against the specified ISO 12944 system.

The standard cycle for a single-building scope is 40 to 50 days: 1–2 weeks to shop drawings for your approval, then 4–5 weeks for procurement, fabrication, coating and loading.